BMP CASE STUDIES
-
South Bay Expressway: Five Years Down the BMP Road
B11 Tuesday, August 20, 8:00AM – 8:30AM / Grand Ballroom E -
BMP Performance Monitoring and Modeling in Fairfax County, VA
B12 Tuesday, August 20, 8:30AM – 9:00AM / Grand Ballroom E -
New York Green Infrastructure Monitoring Results
B13 Tuesday, August 20, 9:00AM – 9:30AM / Grand Ballroom E -
Role of River Stage, Precipitation, and Weather Forecasts in Knowing How Much Stormwater Runoff Will Arrive and When
B21 BMP CASE STUDIES Tuesday, August 20, 2:00PM – 2:30PM / Grand Ballroom E -
An Enhanced Street Sweeping Pilot Program: The Road to Heavy Metals TMDL Reduction Compliance
B22 Tuesday, August 20, 2:30PM – 3:00PM / Grand Ballroom E -
Retrofitting Stormwater Ponds for Improved Water-Quality Performance: Techniques, Tools, and Examples From Kitsap County, WA
B31 BMP CASE STUDIES Tuesday, August 20, 3:30PM – 4:40PM / Grand Ballroom E -
Subsurface Flow Wetland Performance Monitoring for Detention Basin Retrofits
B32 BMP CASE STUDIES Tuesday, August 20, 4:00PM – 4:30PM / Grand Ballroom E -
Anna River Culvert Replacement Project: Sedimentation Control Using Polymer-Enhanced Best Management Practices
B33 BMP CASE STUDIES Tuesday, August 20, 4:30PM – 5:00PM / Grand Ballroom E -
Light Imprint: Recent Case Studies
B41 BMP CASE STUDIES Wednesday, August 21, 8:00PM – 8:30PM / Grand Ballroom E -
Stormwater Analysis for a National REIT
B42 BMP CASE STUDIES Wednesday, August 21, 8:30AM – 9:00AM / Grand Ballroom E -
A Brief History of Non-Degradation Water-Quality Controls in Austin, TX
B43 BMP CASE STUDIES Wednesday, August 21, 9:00AM – 9:30AM / Grand Ballroom E -
A Case Study for 4th Avenue North Ocean Outfall Permitting and Gross Pollutants Device Selection in Myrtle Beach, SC
B51 BMP CASE STUDIES Wednesday, August 21, 10:00AM – 10:30AM / Grand Ballroom E -
A Case Study for Structural Stormwater Pollution Reduction targeting Floatables, Gross Pollutants, and Trash in Myrtle Beach, SC
B52 BMP CASE STUDIES Wednesday, August 21, 10:30AM – 11:00AM / Grand Ballroom E -
Permeable Pavement Design and Construction
B61 BMP CASE STUDIES Wednesday, August 21, 3:30PM – 4:00PM / Grand Ballroom E -
Post-Construction Surface Infiltration Monitoring of a Permeable Interlocking Concrete Pavement
B62 BMP CASE STUDIES Wednesday, August 21, 4:00PM – 4:30PM / Grand Ballroom E -
Artificial Turf Infiltration Area as a Stormwater Treatment Control BMP
B63 BMP CASE STUDIES Wednesday, August 21, 4:00AM – 4:30AM / Grand Ballroom E -
North Street Reconstruction and Integrated Stormwater Management
B71 BMP CASE STUDIES Thursday, August 22, 8:00AM – 8:30AM / Grand Ballroom E -
Use of Flood Control Detention Basins as a Regional Stormwater BMP
B72 BMP CASE STUDIES Thursday, August 22, 8:30AM – 9:00AM / Grand Ballroom E